
تعداد نشریات | 21 |
تعداد شمارهها | 610 |
تعداد مقالات | 9,029 |
تعداد مشاهده مقاله | 67,082,937 |
تعداد دریافت فایل اصل مقاله | 7,656,396 |
Identification of risks causing delays in design development and construction stages of state-owned irrigation projects in Turkey | ||
International Journal of Nonlinear Analysis and Applications | ||
مقاله 183، دوره 14، شماره 1، فروردین 2023، صفحه 2341-2349 اصل مقاله (380.33 K) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22075/ijnaa.2022.7225 | ||
نویسندگان | ||
Aseel Abdaljader1، 2؛ Mustafa Günal* 2 | ||
1Dams and Water Resource Department, University of Anbar, Ramadi, Iraq | ||
2Graduate School of Natural and Applied Sciences, Gaziantep University, Gaziantep, Turkey | ||
تاریخ دریافت: 16 تیر 1401، تاریخ بازنگری: 28 مرداد 1401، تاریخ پذیرش: 04 مهر 1401 | ||
چکیده | ||
This work is carried out to determine various risk factors which cause delays in the design and development of state-owned irrigation projects in Turkey. Various factors such as management problems, design complexities, financial matters, labor attitude, equipment scarcities, and external risks were qualitatively studied. Data was collected through direct interviews with persons in state-owned irrigation projects and by a questionnaire survey (GAP project as a case study). The questionnaire was designed as on various questions and responses generated during direct interviews. It can be realized that major risk factors which arise through, management, design complexities, and financial matters, are mainly linked to the clients (i.e., Government and consulting firms) causing delayed completion of state-owned projects. During the execution cycle of the project, the contractors also produce a significant portion of risks related to common labor and equipment scarcity. This study can provide, and help in determining a suitable way forward for the completion of projects in time, by omitting delays caused by the government, and processing financial and other matters should be processed in due course for fruitful completion. Contractors should also be bound to follow the given time frame of each project and complete it within a stipulated time. Although external factors such as natural calamities put a strain on project completion time, management should be forecasting these factors and maintain a corrective course of action in case of any. | ||
کلیدواژهها | ||
Construction risk management؛ Delay factors؛ Irrigation construction projects in Turkey | ||
آمار تعداد مشاهده مقاله: 16,944 تعداد دریافت فایل اصل مقاله: 216 |