Proposing a lower bound for a nonlinear scheduling problem in supply chain | ||
| International Journal of Nonlinear Analysis and Applications | ||
| مقاله 85، دوره 12، شماره 1، مرداد 2021، صفحه 1073-1085 اصل مقاله (349.46 K) | ||
| نوع مقاله: Research Paper | ||
| شناسه دیجیتال (DOI): 10.22075/ijnaa.2017.1616.1422 | ||
| نویسندگان | ||
| Mohammad Ali Beheshtinia* ؛ Amir Ghasemi | ||
| Department of Industrial Engineering, Faculty of Materials and Industrial Engineering, Semnan University, Semnan 35195-363, Iran | ||
| چکیده | ||
| This paper proposes a nonlinear programming model for a scheduling problem in the supply chain. Due to the nonlinear structure of the developed model and its NP-hard structure, a lower bound is developed. Four lemmas and a theorem are presented and proved to determine the lower bound. The proposed problem is inspired from a three stage supply chain commonly used in various industries. | ||
| کلیدواژهها | ||
| scheduling؛ supply chain؛ lower bound؛ nonlinear programming | ||
| مراجع | ||
|
| ||
|
آمار تعداد مشاهده مقاله: 16,229 تعداد دریافت فایل اصل مقاله: 9,539 |
||
| تعداد نشریات | 22 |
| تعداد شمارهها | 718 |
| تعداد مقالات | 10,319 |
| تعداد مشاهده مقاله | 72,323,695 |
| تعداد دریافت فایل اصل مقاله | 64,046,966 |